- Roads and maintenance
- REM
- Info construction

In order to reinforce the slopes on both sides of the rails in the railway right-of-way, between the Laird Bridge and the Montgomery Pedestrian Bridge, construction work will take place from April 11 to June 2022 to install stabilization piles. The work will take place during daylight hours and weekdays between 7:00 and 19:00.
Preliminary and subsequent work during this period is also necessary to mobilize and demobilize all the elements required for the execution of the work and the clean-up of the site.
Please note that significant noise will be generated when the metal piles are inserted into the ground with the machinery.
For more information, see the news at the source : https://rem.info/en/works-info/slope-stabilization-work-embankments
For any questions, comments or complaints, you can contact the REM directly with the information provided below.
Information
REM (construction work)
Facebook: REMgrandmtl
Twitter: REMgrandmtl
1 833 rem-info (1 833 736-4636)
info@rem.info
rem.info
To subscribe to the REM newsletter and alerts: