Work to come Water Main Rehabilitation on Canora Road: May 11 to July 10, 2026 Please note that work to repair the drinking water pipes on CANORA began on Monday, May 11, 2026. Disruption: The southbound lane will be closed at all times Th......
Learn more
Replacement of the Russell pedestrian bridge over the REM: High-priced bids rejected, rehabilitation of existing structure planned. Town of Mount Royal, November 23, 2022 – Prices deemed too high led Town of Mount Royal Council to reject, at its......
Learn more
The first site mobilization will take place on April 14. Overview of planned work: Rehabilitation of the aqueduct network; Resurfacing of street sections; Repair of the Laird Bridge; Creation of protected two-way bicycle lanes; Creation of......
Learn more
Updated on May 20, 2025 at 13:30 The boil advisory is now lifted on the temporary network on Graham and Regent . A boil water advisory was in effect for homes located in the Graham Boulevard and Regent Road area, in connection with the rehabi......
Learn more