Different fees are applicable to the delivery of goods and services supplied by Public Works, for both residents and contractors.
- Pick-up and disposal of waste materials other than those generated by a contractor or during remunerated services
- $65 minimum per location (1 m3 during working hours only)
- Branch pick-up and disposal
- 95 $ minimum per location (0.5 hr maximum during working hours only)
- Machinery, vehicles, equipment, tools
- As per the document entitled Taux de location de machinerie lourde (2015 edition) published by the Quebec Government
- Request to interrupt or restore water
- $25 each
- Concrete base and asphalt surface
- $300/m2
- Concrete sidewalk
- $250/m2
- Concrete curb
- $150/lin. m
- Asphalt and macadam roadway (including private driveways, asphalt pathways, etc.)
- $150/m2
- 75 mm (3 in.) or less asphalt surface only (base already prepared)
- $100/m2
- Grass
- $30/m2
- Soil
- $20/m2
- Interlocking paving ston
- $80/m2