• Roads and maintenance
  • Info construction

Date: Beginning July 12 until November 2019
Where: Mont-Royal Station – east side

Nature of work: 

Beginning July 12, 2019, the logistics zone set up on Canora Road, at the intersection of Regent Road, will be expanded for the next phase of work.Material and equipment, including a power shovel, will be installed in the logistics zone to move materials between the logistics zone and the site.The work will require truck traffic in the neighbourhood; traffic patterns have been altered to minimize traffic and secure the construction zones. Flaggers and signs posted all around the construction site will ensure that pedestrians and vehicles can move about safely.

  • One lane on Canora Road will be closed to vehicles between Regent Road and slightly before the intersection with Laird Boulevard.
  • Parking will be prohibited in the zone.

Information

REM (construction work)
Facebook: REMgrandmtl
Twitter: REMgrandmtl
1 833 rem-info (1 833 736-4636)
info@rem.info
rem.info

To subscribe to the REM newsletter and alerts:

exo (train lines)
Twitter: exo5_MA | exo6_DM
514 287-TRAM (8726)